37 Sackville Terrace, Scarborough – Project Update March 2017

We are pleased to report that all slabs have now been poured at Sackville Terrace. The pour was conducted in two stages, so the rear units have now had time to cure and work will commence shortly on the brickwork to these levels.

Bricks were delivered to site last week along with all window and door frames. We look forward to updating you as the project progresses.